Analisis Produktifitas Tenaga Kerja pada Bengkel Sumber Teknik Menggunakan Metode Work Sampling

Main Article Content

Dimas Yusuf Fatoni
Nindya Nuanda Ardha Brillianio

Abstract

This study aims to analyze the proportion of productive and non-productive work time among the workforce, identify non-productive activities, and formulate proposals for productivity improvement at the Sumber Teknik Workshop in Prigi Village, Watulimo District, Trenggalek Regency. The study employs a quantitative descriptive approach using the Work Sampling method—observing workforce activities at random intervals to determine the proportions of productive and non-productive work. Observations were conducted on two welding operators, totaling 834 observations, and the data were analyzed using Microsoft Excel. The results indicate that Operator 1 engaged in productive activities 73.73% of the time and non-productive activities 26.27% of the time, while Operator 2 recorded figures of 74.22% and 25.78%, respectively. Overall, the average productive activity was 73.98%, and non-productive activity was 26.02%. Non-productive activities included searching for tools, waiting for instructions and materials, waiting for a turn to use tools, running out of electrodes, equipment malfunctions, and rework due to errors. These results suggest that workforce productivity is reasonably good; however, there remains room for improvement through better tool organization, material management, and equipment maintenance

Article Details

Section

Articles

How to Cite

Analisis Produktifitas Tenaga Kerja pada Bengkel Sumber Teknik Menggunakan Metode Work Sampling. (2026). HORIZON: Indonesian Journal of Multidisciplinary, 4(4), 5653-5662. https://doi.org/10.54373/hijm.v4i4.7253

Similar Articles

You may also start an advanced similarity search for this article.